KHALIFA PORT TERMINAL 1 EXPANSION

The Khalifa Port Terminal 1 Expansion Project involved extensive precision works, including capping beam modification, trench cutting for crane foundations, crack repairs, deep core drilling, and funnel pit cutting for utility installations.

  • LOCATION: ABU DHABI PORT
  • DURATION: 14 MONTHS
Commercial Construction image

BRIDGE 51 SADIYAT DECOMMISIONING

The Bridge 51 Saadiyat Decommissioning Project included the complete demolition of the bridge deck, girders, abutments, and piles, along with the removal of asphalt layers, barriers, interlocks, and rock protection works, ensuring safe disposal and site clearance.

  • DURATION: 2 MONTHS
Planing Execution Image in Saudi Arabia

2020 EXPO – ROUTE 2020 METRO RAIL

The Expo 2020 – Route 2020 Metro Rail Project involved controlled demolition of 23 crane foundations using diamond saw and wire cutting, segment lifting, robotic demolition, and complete site clearance in compliance with Dubai Expo 2020 standards.

  • DURATION: 2 Months
Palm jumeirah construction work image

THE PALM JUMEIRAH GATEWAY

The Palm Jumeirah Gateway Projectincluded precision diamond saw cutting and controlled demolition in multiple parking areas, along with core drilling for MEP, HVAC, rebar planting, and slab or wall removals for structural modifications.

  • DURATION: 4 MONTHS
OUR CLIENT

We’ve 1500+ Global
Premium Clients

A modern, technology-enabled, wellness-focused
workspace and sustainable office tower,

Copyright © 2025 Corecut Company | Designed By Creatick Solutionz